pp plastic formwork container loading

pp plastic formwork container loading

07-04-2023

hongwei platic got the professional loading team for the container loading, everyday we load 3-4containers pp coroplast sheets and the plastic formwork boards. We can load by bulk, also can easily do the pallets loading. For 40hq container, we need 2-3hours for bulk loading, need 1-2hours for pallets loading with the forklift. 


We got 8people professional loading team. The loading stuff are strong and barve for everyday's work,  the professional loading team for the container loading, everyday we load 3-4containers pp coroplast sheets and the plastic formwork boards. We can load by bulk, also can easily do the pallets loading. For 40hq container, we need 2-3hours for bulk loading, need 1-2hours for pallets loading with the forklift. the professional loading team for the container loading, everyday we load 3-4containers pp coroplast sheets and the plastic formwork boards. We can load by bulk, also can easily do the pallets loading. For 40hq container, we need 2-3hours for bulk loading, need 1-2hours for pallets loading with the forklift. 


plastic formwork

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy